Work continues on the new Gathering space addition at Hope Church. The recessed panels for future video screens flanking the main stage have emerged (above) while the center of the front wall receives sound batt insulation. Protective coverings drape over the decorative wood trusses as a variety of work goes on in the ceiling around them, including electrical, insulation and sprinkler installation.
Exterior work includes the placement of cement board and preparation for the stone veneer in certain areas, while brick veneer has been added in other areas. Siding has already been installed, and clerestory windows have been set.
A section of the exterior wall, which will contain a large window, has been left open for access by construction equipment and for the delivery of materials.
More updates will be coming as Hope Church’s expansion plans become reality!